Home / Blog / Guide

November 3, 2026

Little River, SC Remodeling Contractor: Permits via County

Looking for a remodeling contractor in Little River, SC? Here’s who issues your permit (Horry County) and what that means for your project.

  • 5.0 on Google · 76 reviews
  • Licensed and insured
  • 17+ years of experience

Remodeling permits in Little River, SC come from Horry County Code Enforcement, the county department that reviews and issues building permits there, not from a city office.

Remodeling permits in Little River, SC come from Horry County Code Enforcement, the county department that reviews and issues building permits there, not from a city office. That’s because Little River has no city government and no city permit office of its own: it’s an unincorporated community in Horry County, so every remodeling permit here goes through the same county office that handles permits for every other unincorporated part of Horry County. Top GM Construction works throughout Little River and builds that permitting step into every project, from the first consultation to the final walkthrough.

Why Little River Has No Permit Office of Its Own

Little River is officially a census-designated place (CDP), not an incorporated town or city. That means it has no mayor, no city council, and no municipal building department. According to Wikipedia’s history of the community, Little River grew up as an unincorporated area next to what later became North Myrtle Beach, in part so residents could stay close to the coast while avoiding city taxes and city governance.

That history still shapes the practical side of remodeling there today. Where North Myrtle Beach homeowners deal with their own city planning department, Little River homeowners deal with exactly one office for permits, code questions, and inspections: Horry County.

Who Actually Issues Your Remodeling Permit

For any remodel in Little River, kitchen, bathroom, addition, siding, windows, or a full whole-home renovation, the permit comes from Horry County Code Enforcement, not from a Little River or North Myrtle Beach office.

Horry County Code Enforcement

1301 Second Avenue, Ste. 1D09, Conway, SC 29526

Phone: (843) 915-5090

Hours: Monday through Friday, 8 a.m. to 5 p.m.

Horry County’s own published code adoption documents confirm the county operates under the 2021 South Carolina Residential Code. Because Little River is unincorporated, it has no local building department of its own to adopt a different edition or add its own amendments. Whatever Horry County Code Enforcement applies countywide is exactly what applies to a remodel in Little River.

If Your Property Sits on the Water: OCRM Review

Properties on tidal creeks and the Intracoastal Waterway in the North Myrtle Beach, Little River, and Cherry Grove areas can fall under additional review from the Office of Ocean and Coastal Resource Management (OCRM), on top of the standard county building permit, according to South Carolina’s state environmental agency. Little River borders the Atlantic Intracoastal Waterway at the North Carolina and South Carolina state line, and part of the area sits along tidal creeks.

This doesn’t apply to every home in Little River, most of the CDP isn’t waterfront, but if your lot touches a tidal creek or the Intracoastal Waterway, it’s worth asking early whether an OCRM critical-area review applies to your project. Inland homes in Little River don’t carry that extra layer.

What a Single Permit Authority Means for Your Timeline

There’s an upside to Little River’s setup: homeowners deal with one office, one code edition, and one set of inspectors for the entire remodel, rather than coordinating between a city department and the county. Review times still follow Horry County’s normal process for the scope of work, a kitchen or bathroom remodel moves faster than a whole-home renovation or an addition that changes the home’s footprint.

A waterfront project that also needs OCRM review will generally take longer to get to a permit in hand, since that’s a separate state-level review layered on top of the county’s. Starting that conversation at the estimate stage, instead of after a contract is signed, is the easiest way to keep a project on schedule.

Whole Home Renovation and Other Remodeling Services in Little River

Top GM Construction serves Little River as part of its Myrtle Beach-area service area, alongside Myrtle Beach, North Myrtle Beach, Conway, Surfside Beach, and Murrells Inlet. For a project that touches more than one room, a whole home renovation keeps design, permitting, and construction under one contractor instead of coordinating separate trades room by room.

Smaller-scope projects are common in Little River too: bathroom remodeling and home additions are both services Top GM Construction handles start to finish, each permitted the same way, through Horry County Code Enforcement.

How Top GM Construction’s Process Works

Every project, in Little River or anywhere else in the service area, follows the same six steps:

  1. Initial Consultation
  2. Detailed Estimate
  3. Contract Signing
  4. Pre-Construction Meeting
  5. Execution
  6. Final Walkthrough

With more than 17 years working in the Myrtle Beach area, Top GM Construction builds the Horry County permitting step into the estimate and pre-construction meeting stages, so the permit timeline is part of the plan from the start, not a surprise partway through the project. Top GM Construction is licensed and insured.

Frequently Asked Questions

Does Top GM Construction serve Little River, SC?

Yes. Little River is part of Top GM Construction’s service area, along with Myrtle Beach, North Myrtle Beach, Conway, Surfside Beach, and Murrells Inlet. For reference on scope, see this kitchen remodeling project overview, which lists Little River among the cities served.

Who issues a remodeling permit if I live in Little River?

Horry County Code Enforcement. Because Little River is unincorporated, every remodeling permit for the area goes through the county, under the 2021 South Carolina Residential Code.

Do waterfront properties in Little River need extra approval?

They might. Properties on tidal creeks or the Intracoastal Waterway in the Little River area can be subject to an additional critical-area review from the Office of Ocean and Coastal Resource Management (OCRM), South Carolina’s agency for reviewing coastal and waterway projects, on top of the standard county building permit. Inland properties typically don’t need this extra step.

Is Top GM Construction licensed and insured?

Yes, Top GM Construction is licensed and insured for remodeling work in the Myrtle Beach area, including Little River.

How does a remodeling project with Top GM Construction get started?

It starts with an initial consultation, followed by a detailed estimate. From there, a signed contract and a pre-construction meeting set the scope, schedule, and permitting steps before work begins.

Sources: Wikipedia, "Little River, South Carolina" (https://en.wikipedia.org/wiki/Little_River,_South_Carolina); Horry County Government, Code Enforcement department page (https://www.horrycountysc.gov/departments/code-enforcement/); Horry County Government, "2021 South Carolina Code Adoptions" (https://www.horrycountysc.gov/media/hwwpypks/2021-south-carolina-code-adoptions.pdf); South Carolina Department of Environmental Services, Horry County Local Comprehensive Beach Management Plan (https://des.sc.gov/sites/des/files/Documents/BCM/LCBMPs/Horry_County_LC_2023.pdf).

Free estimate

Ready to talk about your project?

Tell us a little about your home. We will call you back to set up a visit and prepare your estimate.

  • Free estimate
  • Licensed and insured
  • One team from start to finish

Or call us now:
(843) 823-3000

Get your free estimate

Tell us about your project. We will call you back to set up a visit.

We only use your information to answer your request.

Prefer to talk? Call (843) 823-3000

Call nowFree Estimate